Home/Services/Bathroom Remodeling

Manatee & Sarasota firstManatee & Sarasota first

Bathroom remodeling
in Bradenton & Lakewood Ranch.

Work with Eric and David DeForest on a bathroom planned around your home and daily routine. Elevra Construction coordinates layout, waterproofing, tile, fixtures, lighting, cabinetry, and finish work across Manatee and Sarasota Counties.

Start with your city or ZIP, what you want to change, your budget, and preferred timing. Tell us if this is your only bathroom.

Completed Longboat Key bathroom with custom white cabinetry, blue walls, and patterned tile flooringCompleted project · Longboat Key
Completed Longboat Key bathing area with white tile and handheld shower fixtures

From our Longboat Key portfolio

Bathing and storage,
planned for daily life.

Explore the accessible bathing area and bathroom storage within this coastal whole-home remodel. See the real project and how the bathroom improvements fit the wider renovation.

Explore the coastal remodel

A clearer way to build

Every visible finish depends on careful work behind it.

Bathrooms concentrate plumbing, electrical work, ventilation, waterproofing, tile, cabinetry, and finish carpentry into a compact space. Good coordination matters.

We organize the sequence, clarify decisions early, and maintain consistent communication so the finished bathroom performs as well as it looks.

What we coordinate

One scope.
Fewer loose ends.

Every project is shaped by the existing property, your priorities, and the agreed construction plan. These are the areas we bring together.

01

Layout & plumbing

Planning fixture locations and circulation with practical coordination of the plumbing work involved.

02

Showers & tubs

Coordinated shower and tub improvements, including surrounds, glass, fixtures, niches, and finish details.

03

Waterproofing & tile

Careful sequencing of preparation, waterproofing, tile installation, grout, and transitions.

04

Vanities & storage

Vanity, countertop, mirror, and storage solutions selected to support everyday routines.

05

Lighting & ventilation

Task lighting, general lighting, controls, and ventilation considered as part of the full room plan.

06

Comfort & accessibility

Practical improvements that can make the room easier, safer, and more comfortable to use.

How the work moves

A clear path
from start to finish.

A clear sequence protects the details that matter most in a bathroom—from what sits behind the tile to the final fit of every fixture.

  1. 01

    Assess

    We review the existing room, discuss your goals, and identify layout, condition, access, and finish priorities.

  2. 02

    Plan

    We define the scope, material allowances, exclusions, and trade responsibilities. We discuss bathroom downtime and material delivery before scheduling demolition.

  3. 03

    Rebuild

    The work proceeds in a coordinated sequence with progress updates and quality checks at each stage.

  4. 04

    Complete

    Fixtures, glass, trim, paint, and final details are reviewed together during the closeout process.

Common questions

Helpful answers
before we begin.

Planning a remodel in Parrish? Read our local planning answers →

Does Elevra handle complete bathroom remodels?+

Yes. Elevra coordinates complete bathroom renovation scopes, including the participating trades, materials, installations, communication, and final walkthrough.

What affects the cost of a bathroom remodel?+

The existing condition, room size, plumbing changes, shower or tub scope, waterproofing, tile, vanity, fixtures, and installation work all affect the estimate. Compare what is included, which selections are allowances, and what is excluded. Concealed damage may require a scope change after demolition; a budget cannot be confirmed from room size alone.

Is $10,000 enough for my bathroom project?+

That depends on what you want to change and what the existing room needs. Share your budget and priorities so we can review the scope together. A finish update and a full bathroom rebuild are different projects; we do not quote a complete remodel from a budget figure alone.

Can accessibility improvements be included?+

Yes. Depending on the room and project goals, we can discuss practical improvements such as easier shower access, improved clearances, better lighting, and thoughtfully placed support features.

How is the project timeline determined?+

Timing depends on the room condition, scope, inspections when applicable, material availability, and installation sequence. We establish the working schedule after those details are understood.

What if this is our only bathroom?+

Tell us before the scope and schedule are agreed. Discuss when the toilet, shower, or tub will be unavailable and what temporary arrangements you will need. Do not assume the bathroom can stay usable throughout demolition and rebuilding.

What should I send before an estimate?+

Start with your city or ZIP, photos of the current room, what you want to keep or replace, your budget, and preferred timing. Mention any access needs and whether another bathroom is available. Finished plans and purchased fixtures are not required for the first conversation.

Where does Elevra provide this service?+

Manatee and Sarasota Counties are our core service area. We consider select projects in Hillsborough, Hardee and Pinellas Counties based on scope, travel and availability.

Request an estimate

Let’s make the room work better.

Share your city or ZIP, what you want to keep or replace, your budget, and preferred timing. Tell us if this is your only bathroom.